"kopų žuvėdra", giruliai

The new building construction in Giruliai utilized the advanced Layher scaffolding system for its flexibility, safety, and efficiency. To protect the structure from weather, special sheeting covered the scaffolding, allowing work to continue uninterrupted by rain or snow. This ensured that construction proceeded on schedule, with all areas of the building easily accessible throughout the project.